Arthur Belleville
18a705c812
fix(16): restore task-drag-handle for Sortable.js drag-and-drop
...
Phase 16 executor removed the .task-drag-handle div from TaskCard
during restyling. Sortable.js handle: '.task-drag-handle' had no
matching element → dragging completely non-functional.
Restores the grip element with CSS-token styling (no Tailwind).
2026-05-16 23:58:51 +02:00
Arthur Belleville
965ec5e5ce
docs(16): create phase 16 tablo detail plan — 4 plans, 4 waves
...
Phase 16 delivers DETAIL-01/02/03/04: header restyling, kanban
tasks-section layout with server-side etape grouping, and files
table component. Ends with a browser verify checkpoint.
Co-Authored-By: Claude Sonnet 4.6 (1M context) <noreply@anthropic.com>
2026-05-16 23:20:49 +02:00
Arthur Belleville
716678cddd
docs(phase-15): update tracking after wave 2
2026-05-16 22:25:13 +02:00
Arthur Belleville
ae0ab0ca5b
docs(phase-15): update tracking after wave 1
2026-05-16 21:44:18 +02:00
Arthur Belleville
140f400e10
docs(phase-15): update tracking after wave 0
2026-05-16 21:39:58 +02:00
Arthur Belleville
8baf8a430f
docs(15): create phase plan — sidebar + project-card dashboard
...
3 plans across 3 waves:
- 15-01 (Wave 0): RED test stubs for DASH-01/02/03
- 15-02 (Wave 1): app.css CSS foundation + AppLayout templ component
- 15-03 (Wave 2): tablos.templ restyled + handler wiring + visual checkpoint
Co-Authored-By: Claude Sonnet 4.6 (1M context) <noreply@anthropic.com>
2026-05-16 21:28:25 +02:00
Arthur Belleville
51cb9bd895
docs(14-01): complete auth assets and components plan
2026-05-16 19:07:39 +02:00
Arthur Belleville
5ed9291d76
docs(14): create phase plan for auth pages restyle
...
Two-wave plan: Plan 01 creates foundation (logo assets, full auth.css
replacement with animations, auth_components.templ, auth_layout.templ);
Plan 02 migrates auth_login.templ and auth_signup.templ to AuthLayout
with @ui.FormField inputs and cross-page nav links, closing AUTH-UI-01..03.
Co-Authored-By: Claude Sonnet 4.6 (1M context) <noreply@anthropic.com>
2026-05-16 18:58:59 +02:00
Arthur Belleville
0dac33b784
docs(phase-13): complete phase execution
2026-05-16 18:24:23 +02:00
Arthur Belleville
45a914f4ea
docs(13): create phase plan
2026-05-16 13:28:09 +02:00
Arthur Belleville
9e954a40e7
docs(13): create phase 13 design system foundation plan (5 plans, 4 waves)
...
Co-Authored-By: Claude Sonnet 4.6 (1M context) <noreply@anthropic.com>
2026-05-16 13:20:43 +02:00
Arthur Belleville
fcffb57df4
chore: archive v2.0 milestone
2026-05-16 11:01:12 +02:00
Arthur Belleville
7a1eaa7b0f
docs: create milestone v3.0 roadmap (5 phases)
2026-05-16 10:57:13 +02:00
Arthur Belleville
81538bb780
docs(12-03): complete discussion realtime plan
2026-05-16 10:34:41 +02:00
Arthur Belleville
0fa34cebf0
docs(12-02): complete discussion unread plan
2026-05-16 10:16:24 +02:00
Arthur Belleville
6af4d70d51
docs(12-01): complete discussion foundation plan
2026-05-16 10:12:06 +02:00
Arthur Belleville
74a5f17d09
docs(11): verify phase completion
2026-05-16 09:07:50 +02:00
Arthur Belleville
9a8cdf097f
docs(11-02): complete verification plan
2026-05-16 09:05:59 +02:00
Arthur Belleville
404b545a5d
docs(11-01): complete planning agenda plan
2026-05-16 07:28:12 +02:00
Arthur Belleville
34d2c23e20
docs(phase-10): complete phase execution
2026-05-16 06:46:15 +02:00
Arthur Belleville
a94550e72b
docs(10-03): complete event navigation plan
2026-05-16 00:35:41 +02:00
Arthur Belleville
0dc0e8978f
docs(10-02): complete event mutation plan
2026-05-16 00:33:33 +02:00
Arthur Belleville
c45e96d610
docs(10-01): complete events creation plan
2026-05-16 00:29:27 +02:00
Arthur Belleville
90af9bdaef
feat(08): disable apple sign-in
2026-05-15 21:41:22 +02:00
Arthur Belleville
f9f528544d
docs(08): complete social sign-in execution
2026-05-15 21:13:59 +02:00
Arthur Belleville
cd8034f33b
docs: create milestone v2.0 roadmap (5 phases)
2026-05-15 20:16:20 +02:00
Arthur Belleville
2a73bba4e1
docs(phase-07): complete phase execution
2026-05-15 18:47:58 +02:00
Arthur Belleville
8ae83f6c50
docs(07): create phase plan
2026-05-15 18:06:08 +02:00
Arthur Belleville
dbe9d493be
docs(07): create phase 7 plan — deploy v1 (3 plans, 3 waves)
...
Co-Authored-By: Claude Sonnet 4.6 (1M context) <noreply@anthropic.com>
2026-05-15 17:57:46 +02:00
Arthur Belleville
eec691442a
docs(06): resolve SC-3/SC-4 conflict — accept D-03/D-06 deferrals
...
ROADMAP SC-3 (list-failed-jobs CLI) and SC-4 (web binary enqueue) struck
through as deferred per CONTEXT.md decisions D-03 and D-06. VERIFICATION.md
status updated to complete (3/3 active success criteria).
Co-Authored-By: Claude Sonnet 4.6 (1M context) <noreply@anthropic.com>
2026-05-15 17:21:25 +02:00
Arthur Belleville
9e07407484
docs(06-02): complete cmd/worker river wiring plan
...
- 06-02-SUMMARY.md: river wiring summary with commits, decisions, threat flag review
- STATE.md: decisions, metrics, notes, SUMMARY reference added for Plan 02
- ROADMAP.md: 06-02 marked complete (2/3 plans executed)
2026-05-15 16:39:54 +02:00
Arthur Belleville
94ac095dee
docs(06-01): complete jobs foundation plan
2026-05-15 16:35:31 +02:00
Arthur Belleville
71d9c32e85
docs(06): create phase plan
2026-05-15 16:30:23 +02:00
Arthur Belleville
f242b7184f
docs(06): create phase 6 background worker plans
...
Three plans: Wave 1 adds river dependency + internal/jobs package with unit
tests; Wave 2 wires cmd/worker/main.go with full river runtime + justfile
target + README; Wave 3 is human-verify checkpoint.
Co-Authored-By: Claude Sonnet 4.6 (1M context) <noreply@anthropic.com>
2026-05-15 16:20:11 +02:00
Arthur Belleville
ab30db4a2f
docs(phase-5): complete phase execution
2026-05-15 12:46:25 +02:00
Arthur Belleville
aab336fa36
docs(phase-05): update tracking after wave 4
2026-05-15 12:38:20 +02:00
Arthur Belleville
fe4f166ce3
docs(phase-05): update tracking after wave 3
2026-05-15 12:36:06 +02:00
Arthur Belleville
072eda1028
docs(phase-05): update tracking after wave 2
2026-05-15 12:30:36 +02:00
Arthur Belleville
74af9d7052
docs(phase-05): update tracking after wave 1
2026-05-15 12:21:26 +02:00
Arthur Belleville
5ce8b70f69
docs(05): create phase plan
...
Co-Authored-By: Claude Sonnet 4.6 (1M context) <noreply@anthropic.com>
2026-05-15 12:14:48 +02:00
Arthur Belleville
f115082bd5
docs(05): create phase 5 file upload plans (4 plans, 4 waves)
...
Adds 4 PLAN.md files for Phase 5 — Files. Wave 1 lays the S3
foundation (aws-sdk-go-v2, migration, FileStorer, MinIO compose).
Wave 2 delivers the upload + list vertical slice with 3-tab tablo
layout. Wave 3 closes download + delete. Wave 4 is the browser
verify checkpoint.
Co-Authored-By: Claude Sonnet 4.6 (1M context) <noreply@anthropic.com>
2026-05-15 11:58:52 +02:00
Arthur Belleville
06bbb49a7f
docs(04-04): human checkpoint approved — phase 4 complete
...
All 7 TASK requirements verified in browser. Two bugs found and fixed
during verification (badge count, drag-and-drop draggable selector).
Co-Authored-By: Claude Sonnet 4.6 (1M context) <noreply@anthropic.com>
2026-05-15 10:04:21 +02:00
Arthur Belleville
8ac0a51969
docs(04-03): complete plan 03 — inline edit + reorder fully implemented
...
- 04-03-SUMMARY.md created with full execution details
- STATE.md updated: decisions, metrics, notes for plan 03
- ROADMAP.md updated with plan progress (3/4 summaries for phase 4)
2026-05-15 09:40:35 +02:00
Arthur Belleville
5158eb09af
docs(04-02): complete kanban vertical slice plan — handlers, templates, test activation
...
- Add 04-02-SUMMARY.md with full decisions and deviation documentation
- Update STATE.md: Plans 01-02 done, add decisions, metrics, notes
- Update ROADMAP.md phase 4 progress (2/4 plans complete)
2026-05-15 09:35:03 +02:00
Arthur Belleville
2be4cb6bc9
docs(04-01): complete Wave 0 foundation plan summary and state updates
...
- 04-01-SUMMARY.md: documents migration, sqlc, RED scaffold, Sortable.js, soft-danger CSS
- STATE.md: Phase 4 in-progress, 3 new decisions recorded, metrics row added
- ROADMAP.md: Phase 4 progress updated (1/4 plans)
- REQUIREMENTS.md: TASK-01..07 marked complete
2026-05-15 09:26:31 +02:00
Arthur Belleville
7f58588f5a
docs(04): create phase 4 tasks-kanban plan (4 plans, 3 waves)
...
Wave 1 (Plan 01): DB migration, sqlc queries, RED test scaffold, Sortable.js bootstrap, soft-danger CSS.
Wave 2 (Plan 02): Kanban board render + task create + task delete vertical slice (TASK-01, TASK-02, TASK-06).
Wave 3 (Plan 03): Inline task edit + Sortable.js drag reorder/move (TASK-03, TASK-04, TASK-05, TASK-07).
Wave 4 (Plan 04): Human-verify checkpoint — full browser verification of all 7 TASK requirements.
Co-Authored-By: Claude Sonnet 4.6 (1M context) <noreply@anthropic.com>
2026-05-15 09:16:17 +02:00
Arthur Belleville
450291a697
docs(03-03): complete Phase 3 — advance state and roadmap
...
Phase 3 Tablos CRUD fully complete: all 3 plans done, TABLO-01..06
closed, 10/10 TABLO tests green, browser verify passed. Advance active
phase to Phase 4 Tasks (Kanban).
Co-Authored-By: Claude Sonnet 4.6 (1M context) <noreply@anthropic.com>
2026-05-15 08:10:31 +02:00
Arthur Belleville
a78221ae1c
docs(03-03): plan 03-03 summary and state
2026-05-15 08:03:58 +02:00
Arthur Belleville
c4406cf16c
docs(03-02): plan 02 SUMMARY + STATE update — checkpoint at Task 3
...
- 03-02-SUMMARY.md: TablosDeps, handler contracts, template contracts,
4/10 tests green, 6 RED for Plan 03, known stubs documented
- STATE.md: 2 new decisions, plan 02 metrics row added, notes updated
- ROADMAP.md: phase 3 progress updated (2/3 summaries)
2026-05-15 00:22:16 +02:00
Arthur Belleville
2f22d68776
docs(03-01): complete Plan 01 — migration, test scaffold, button CSS
...
- 03-01-SUMMARY.md: tablos schema foundation, RED test scaffold, button CSS variants
- STATE.md: decisions + metrics for 03-01; phase 3 status updated
- ROADMAP.md: phase 3 plan progress (1/3 complete)
- REQUIREMENTS.md: TABLO-01..06 marked complete
2026-05-15 00:15:36 +02:00